Current Activities
(Redirected from Current events)
Jump to navigation
Jump to search
This page describes (or connects to) one or two current activities for each group.
Labs and Students Support Group
Until January 20:
Install Printer HP2200 to Graduate Lab 201(hp1-201 ?)Done 11/01/2006- Install Opnet Application Capture Agents to 201 lab ??? postponed until next semester
Prepare new programm for epithrhtesClear local profiles from all lab machinesOrder maintenance kit for HP1-B123 and HP1-L0- B123 ReplacedPrepare and place 4 new PCs (Fujitsu Siemens) for B101Done 19/01/2006Set bios passwords for administrator and also user (not to get mac addresses)not possibleCheck all DLP`s in labs.DoneDeny access to domain users to command "getmac"Done 11/01/2006- Stop sychronization by some users to Windows machines (sychronize only when they are logging off - NOT always)
Find a way to change SID to each PC ???time-consuming and not really necessary since machines will be reformatted next semester- Prepare and replace 4 w/s at B103 tm 14:53, 12 Ιαν 2006 (EET)
Replace Norton Anti-virus on CS1993 (room 148)Done 16/01/2006
Until May 31:
Order USB extensions for lab B101 (Fujitsu Siemens PCs)Andrim 15:49, 10 Μαρτ 2006 (EET)- Prepare installation images for lab B103
- Update Computing site
Update Helpdesk siteAndrim 15:49, 10 Μαρτ 2006 (EET)- MSDNAA
- Update print guide to include print quotas
- Investigate the problem with standby mode on IBM machines
Order process (CRM???)DonePrepare and place 4 new PCs (Fujitsu Siemens) for 101.Done 02/02/2006Find a solution to Acrobat Distiller 7.0 CPU usage problem.kekkosFind a solution to jedit (B121-B123) problem.Andrim 15:49, 10 Μαρτ 2006 (EET)Find a solution to SPIN (201)problem.Andrim 15:49, 10 Μαρτ 2006 (EET)Install gcc in order to correct SPIN(201).Andrim 15:49, 10 Μαρτ 2006 (EET)
Until August 31:
- Apply images for lab B103.
- Update all labs softwares.
- Rename printers ibmlab1 and npi8585d5
Core Systems Group
Until January 20:
Install Print Manager Plus s/w?? or postponed it for next semester
Until May 31:
- TSM
Install 2 HDD (Tuesday Feb. 15)- Reconfiguration of policies
Include new ultrium drive in set-up
Finish with TrendMicro server set-up - resolve some problemsPrepare and finalize Server Storage PlanDHCP and DNS server upgrade
Until August 31:
- Prepare a "new Electra" with IIS etc
Format ElectraMove Kalliopi to new machineFormat Kalliopi and move /research /projects /courses on itSet an internal MYSQL server and move all DBs on itPrepare a new Astarti (www2n)Move most if not all of www2 to www2nFormat and prepare AstartiReview and remove old students,faculty,research a/cs
Networks and Security Group
23-Jan-2006
- Revision of the VLAN schedule, primary aim to assign private IPs to most of our systems especially the Research Labs.
31-May-2006
- Wireless network - phase 1
Properly install and test accees points as they are now without any AA scheme or OS upgrade - good old open wayDone --ank 10:44, 19 Απρ 2006 (EEST)
Test - proper network access, XWIN, printing, E-mail etc.Done! --ank 10:44, 19 Απρ 2006 (EEST)
- Wireless network - phase 2
Upgrade all access points we use to IOS software- Decide on the best AA scheme and see that is implimented in a minimum configuration
- Radius server running is a must for this phase with NIS capabilities
- Wireless network - phase 3
- See if we can put these access points in a dual VLAN mode so that they work for both the newcampus and zephyros SSID
- Make Radius authenticate via the LDAP server and/or NIS
31-Aug-2006
- VPN
Have a departmental VPN up and running
- Security setup
- Redesign some of the network structure to use the DMZ (put DNS, SMTP and WWW servers there).
- DHCP
Redesign and reconfigure DHCP services (upgrade OS, upgrade DHCP server, failover included)
- LDAP, RADIUS
- Install on permanent location these services (join with DHCP/DNS server???) OTY_Internal:Server Allocation