Difference between revisions of "Current Activities"
Jump to navigation
Jump to search
Line 63: | Line 63: | ||
'''31-May-2005''' | '''31-May-2005''' | ||
* Wireless network - phase 1 | * Wireless network - phase 1 | ||
− | :*Properly install and test accees points as they are now without any AA scheme or OS upgrade - good old open way | + | :*<del>Properly install and test accees points as they are now without any AA scheme or OS upgrade - good old open way</del> Done --[[User:Ank|ank]] 10:44, 19 Απρ 2006 (EEST) |
− | ::* Test - proper network access, XWIN, printing, E-mail etc. | + | ::* <del>Test - proper network access, XWIN, printing, E-mail etc.</del> Done! --[[User:Ank|ank]] 10:44, 19 Απρ 2006 (EEST) |
* Wireless network - phase 2 | * Wireless network - phase 2 | ||
:* Upgrade all access points we use to IOS software | :* Upgrade all access points we use to IOS software |
Revision as of 09:44, 19 April 2006
This page describes (or connects to) one or two current activities for each group.
Labs and Students Support Group
Until January 20:
Install Printer HP2200 to Graduate Lab 201(hp1-201 ?)Done 11/01/2006- Install Opnet Application Capture Agents to 201 lab ??? postponed until next semester
Prepare new programm for epithrhtesClear local profiles from all lab machinesOrder maintenance kit for HP1-B123 and HP1-L0- B123 ReplacedPrepare and place 4 new PCs (Fujitsu Siemens) for B101Done 19/01/2006Set bios passwords for administrator and also user (not to get mac addresses)not possibleCheck all DLP`s in labs.DoneDeny access to domain users to command "getmac"Done 11/01/2006- Stop sychronization by some users to Windows machines (sychronize only when they are logging off - NOT always)
Find a way to change SID to each PC ???time-consuming and not really necessary since machines will be reformatted next semester- Prepare and replace 4 w/s at B103 tm 14:53, 12 Ιαν 2006 (EET)
Replace Norton Anti-virus on CS1993 (room 148)Done 16/01/2006
Until May 31:
Order USB extensions for lab B101 (Fujitsu Siemens PCs)Andrim 15:49, 10 Μαρτ 2006 (EET)- Prepare installation images for lab B103
- Update Computing site
Update Helpdesk siteAndrim 15:49, 10 Μαρτ 2006 (EET)- MSDNAA
- Update print guide to include print quotas
- Investigate the problem with standby mode on IBM machines
Order process (CRM???)DonePrepare and place 4 new PCs (Fujitsu Siemens) for 101.Done 02/02/2006Find a solution to Acrobat Distiller 7.0 CPU usage problem.kekkosFind a solution to jedit (B121-B123) problem.Andrim 15:49, 10 Μαρτ 2006 (EET)Find a solution to SPIN (201)problem.Andrim 15:49, 10 Μαρτ 2006 (EET)Install gcc in order to correct SPIN(201).Andrim 15:49, 10 Μαρτ 2006 (EET)
Until August 31:
- Apply images for lab B103.
- Update all labs softwares.
- Rename printers ibmlab1 and npi8585d5
Core Systems Group
Until January 20:
- Install Print Manager Plus s/w?? or postponed it for next semester
Until May 31:
- TSM
- Install 2 HDD (Tuesday Feb. 15)
- Reconfiguration of policies
- Include new ultirum drive in set-up
- Prepare a "new Electra" with IIS etc
- Format Electra
- Set an internal MYSQL server and move all DBs on it
- Prepare a new Astarti (www2n)
- Move most if not all of www2 to www2n
- Format and prepare Astarti
- Review and remove old students,faculty,research a/cs
- Finish with TrendMicro server set-up - resolve some problems
- Prepare and finalize Server Storage Plan
- DHCP and DNS server upgrade
Networks and Security Group
23-Jan-2005
- Revision of the VLAN schedule, primary aim to assign private IPs to most of our systems especially the Research Labs.
31-May-2005
- Wireless network - phase 1
Properly install and test accees points as they are now without any AA scheme or OS upgrade - good old open wayDone --ank 10:44, 19 Απρ 2006 (EEST)
Test - proper network access, XWIN, printing, E-mail etc.Done! --ank 10:44, 19 Απρ 2006 (EEST)
- Wireless network - phase 2
- Upgrade all access points we use to IOS software
- Decide on the best AA scheme and see that is implimented in a minimum configuration
- Radius server running is a must for this phase with NIS capabilities
- Wireless network - phase 3
- See if we can put these access points in a dual VLAN mode so that they work for both the newcampus and zephyros SSID
- Make Radius authenticate via the LDAP server and/or NIS
31-Aug-2005
- Security setup
- Redesign some of the network structure to use the DMZ (put DNS, SMTP and WWW servers there).