Difference between revisions of "Current Activities"
Jump to navigation
Jump to search
(30 intermediate revisions by 4 users not shown) | |||
Line 6: | Line 6: | ||
#<del>Prepare new programm for epithrhtes</del> | #<del>Prepare new programm for epithrhtes</del> | ||
#<del>Clear local profiles from all lab machines</del> | #<del>Clear local profiles from all lab machines</del> | ||
− | #<del>Order maintenance kit for HP1-B123 and HP1-L0</del> | + | #<del>Order maintenance kit for HP1-B123 and HP1-L0</del>{{red| - B123 Replaced}} |
#<del>Prepare and place 4 new PCs (Fujitsu Siemens) for B101</del>{{red| Done 19/01/2006}} | #<del>Prepare and place 4 new PCs (Fujitsu Siemens) for B101</del>{{red| Done 19/01/2006}} | ||
#<del>Set bios passwords for administrator and also user (not to get mac addresses)</del> {{red|not possible}} | #<del>Set bios passwords for administrator and also user (not to get mac addresses)</del> {{red|not possible}} | ||
− | #Check all DLP`s in labs. | + | #<del>Check all DLP`s in labs.</del>{{red|Done}} |
#<del>Deny access to domain users to command "getmac"</del>{{red| Done 11/01/2006}} | #<del>Deny access to domain users to command "getmac"</del>{{red| Done 11/01/2006}} | ||
#Stop sychronization by some users to Windows machines (sychronize only when they are logging off - NOT always) | #Stop sychronization by some users to Windows machines (sychronize only when they are logging off - NOT always) | ||
Line 17: | Line 17: | ||
<br> | <br> | ||
'''Until May 31:''' | '''Until May 31:''' | ||
− | #Order USB extensions for lab B101 (Fujitsu Siemens PCs) | + | #<del>Order USB extensions for lab B101 (Fujitsu Siemens PCs)</del> [[Χρήστης:Andrim|Andrim]] 15:49, 10 Μαρτ 2006 (EET) |
#Prepare installation images for lab B103 | #Prepare installation images for lab B103 | ||
#Update Computing site | #Update Computing site | ||
− | #Update Helpdesk site | + | #<del>Update Helpdesk site</del> [[Χρήστης:Andrim|Andrim]] 15:49, 10 Μαρτ 2006 (EET) |
#MSDNAA | #MSDNAA | ||
#Update print guide to include print quotas | #Update print guide to include print quotas | ||
#Investigate the problem with standby mode on IBM machines | #Investigate the problem with standby mode on IBM machines | ||
− | #Order process (CRM???) | + | #<del>Order process (CRM???)</del>{{red| Done}} |
− | #Prepare and place 4 new PCs (Fujitsu Siemens) for 101. | + | #<del>Prepare and place 4 new PCs (Fujitsu Siemens) for 101.</del>{{red| Done 02/02/2006}} |
− | #<del>Find a solution to Acrobat Distiller 7.0 CPU usage problem.</del>[[User:Kekkos|kekkos]] | + | #<del>Find a solution to Acrobat Distiller 7.0 CPU usage problem.</del> [[User:Kekkos|kekkos]] |
− | #Find a solution to jedit (B121-B123) problem. | + | #<del>Find a solution to jedit (B121-B123) problem.</del> [[Χρήστης:Andrim|Andrim]] 15:49, 10 Μαρτ 2006 (EET) |
+ | #<del>Find a solution to SPIN (201)problem.</del> [[Χρήστης:Andrim|Andrim]] 15:49, 10 Μαρτ 2006 (EET) | ||
+ | #<del>Install gcc in order to correct SPIN(201).</del> [[Χρήστης:Andrim|Andrim]] 15:49, 10 Μαρτ 2006 (EET) | ||
<br> | <br> | ||
'''Until August 31:''' | '''Until August 31:''' | ||
− | #Apply images for lab | + | #Apply images for lab B103. |
#Update all labs softwares. | #Update all labs softwares. | ||
+ | #Rename printers ibmlab1 and npi8585d5 | ||
<br> | <br> | ||
==Core Systems Group== | ==Core Systems Group== | ||
'''Until January 20:''' | '''Until January 20:''' | ||
− | # Install Print Manager Plus s/w?? or postponed it for next semester | + | # <del>Install Print Manager Plus s/w?? or postponed it for next semester</del> |
'''Until May 31:''' | '''Until May 31:''' | ||
# TSM | # TSM | ||
− | #* Install 2 HDD | + | #* <del>Install 2 HDD {{red|(Tuesday Feb. 15)}}</del> |
#* Reconfiguration of policies | #* Reconfiguration of policies | ||
− | #* Include new | + | #* <del>Include new ultrium drive in set-up</del> |
+ | # <del>Finish with TrendMicro server set-up - resolve some problems</del> | ||
+ | # <del>Prepare and finalize Server Storage Plan</del> | ||
+ | # <del>DHCP and DNS server upgrade</del> | ||
+ | |||
+ | '''Until August 31:''' | ||
# Prepare a "new Electra" with IIS etc | # Prepare a "new Electra" with IIS etc | ||
− | # Format Electra | + | # <del>Format Electra</del> |
− | # Set an internal MYSQL server and move all DBs on it | + | # <del>Move Kalliopi to new machine</del> |
− | # Prepare a new Astarti (www2n) | + | # <del>Format Kalliopi and move /research /projects /courses on it</del> |
− | # Move most if not all of www2 to www2n | + | # <del>Set an internal MYSQL server and move all DBs on it</del> |
− | # Format and prepare Astarti | + | # <del>Prepare a new Astarti (www2n)</del> |
− | # Review and remove old students,faculty,research a/cs | + | # <del>Move most if not all of www2 to www2n</del> |
− | + | # <del>Format and prepare Astarti</del> | |
− | + | # <del>Review and remove old students,faculty,research a/cs</del> | |
− | |||
==Networks and Security Group== | ==Networks and Security Group== | ||
− | '''23-Jan- | + | '''23-Jan-2006''' |
* Revision of the VLAN schedule, primary aim to assign private IPs to most of our systems especially the Research Labs. | * Revision of the VLAN schedule, primary aim to assign private IPs to most of our systems especially the Research Labs. | ||
− | '''31-May- | + | '''31-May-2006''' |
* Wireless network - phase 1 | * Wireless network - phase 1 | ||
− | :*Properly install and test accees points as they are now without any AA scheme or OS upgrade - good old open way | + | :*<del>Properly install and test accees points as they are now without any AA scheme or OS upgrade - good old open way</del> Done --[[User:Ank|ank]] 10:44, 19 Απρ 2006 (EEST) |
− | ::* Test - proper network access, XWIN, printing, E-mail etc. | + | ::* <del>Test - proper network access, XWIN, printing, E-mail etc.</del> Done! --[[User:Ank|ank]] 10:44, 19 Απρ 2006 (EEST) |
* Wireless network - phase 2 | * Wireless network - phase 2 | ||
− | :* Upgrade all access points we use to IOS software | + | :* <del>Upgrade all access points we use to IOS software</del> |
:* Decide on the best AA scheme and see that is implimented in a minimum configuration | :* Decide on the best AA scheme and see that is implimented in a minimum configuration | ||
:: Radius server running is a must for this phase with NIS capabilities | :: Radius server running is a must for this phase with NIS capabilities | ||
Line 72: | Line 79: | ||
− | '''31-Aug- | + | '''31-Aug-2006''' |
+ | * VPN | ||
+ | ::* <del>Have a departmental VPN up and running</del> | ||
+ | * Security setup | ||
+ | ::* Redesign some of the network structure to use the DMZ (put DNS, SMTP and WWW servers there). | ||
+ | * DHCP | ||
+ | ::* <s>Redesign and reconfigure DHCP services (upgrade OS, upgrade DHCP server, failover included)</s> | ||
+ | * LDAP, RADIUS | ||
+ | ::* Install on permanent location these services (join with DHCP/DNS server???) [[OTY_Internal:Server Allocation]] |
Latest revision as of 10:23, 14 November 2008
This page describes (or connects to) one or two current activities for each group.
Labs and Students Support Group
Until January 20:
Install Printer HP2200 to Graduate Lab 201(hp1-201 ?)Done 11/01/2006- Install Opnet Application Capture Agents to 201 lab ??? postponed until next semester
Prepare new programm for epithrhtesClear local profiles from all lab machinesOrder maintenance kit for HP1-B123 and HP1-L0- B123 ReplacedPrepare and place 4 new PCs (Fujitsu Siemens) for B101Done 19/01/2006Set bios passwords for administrator and also user (not to get mac addresses)not possibleCheck all DLP`s in labs.DoneDeny access to domain users to command "getmac"Done 11/01/2006- Stop sychronization by some users to Windows machines (sychronize only when they are logging off - NOT always)
Find a way to change SID to each PC ???time-consuming and not really necessary since machines will be reformatted next semester- Prepare and replace 4 w/s at B103 tm 14:53, 12 Ιαν 2006 (EET)
Replace Norton Anti-virus on CS1993 (room 148)Done 16/01/2006
Until May 31:
Order USB extensions for lab B101 (Fujitsu Siemens PCs)Andrim 15:49, 10 Μαρτ 2006 (EET)- Prepare installation images for lab B103
- Update Computing site
Update Helpdesk siteAndrim 15:49, 10 Μαρτ 2006 (EET)- MSDNAA
- Update print guide to include print quotas
- Investigate the problem with standby mode on IBM machines
Order process (CRM???)DonePrepare and place 4 new PCs (Fujitsu Siemens) for 101.Done 02/02/2006Find a solution to Acrobat Distiller 7.0 CPU usage problem.kekkosFind a solution to jedit (B121-B123) problem.Andrim 15:49, 10 Μαρτ 2006 (EET)Find a solution to SPIN (201)problem.Andrim 15:49, 10 Μαρτ 2006 (EET)Install gcc in order to correct SPIN(201).Andrim 15:49, 10 Μαρτ 2006 (EET)
Until August 31:
- Apply images for lab B103.
- Update all labs softwares.
- Rename printers ibmlab1 and npi8585d5
Core Systems Group
Until January 20:
Install Print Manager Plus s/w?? or postponed it for next semester
Until May 31:
- TSM
Install 2 HDD (Tuesday Feb. 15)- Reconfiguration of policies
Include new ultrium drive in set-up
Finish with TrendMicro server set-up - resolve some problemsPrepare and finalize Server Storage PlanDHCP and DNS server upgrade
Until August 31:
- Prepare a "new Electra" with IIS etc
Format ElectraMove Kalliopi to new machineFormat Kalliopi and move /research /projects /courses on itSet an internal MYSQL server and move all DBs on itPrepare a new Astarti (www2n)Move most if not all of www2 to www2nFormat and prepare AstartiReview and remove old students,faculty,research a/cs
Networks and Security Group
23-Jan-2006
- Revision of the VLAN schedule, primary aim to assign private IPs to most of our systems especially the Research Labs.
31-May-2006
- Wireless network - phase 1
Properly install and test accees points as they are now without any AA scheme or OS upgrade - good old open wayDone --ank 10:44, 19 Απρ 2006 (EEST)
Test - proper network access, XWIN, printing, E-mail etc.Done! --ank 10:44, 19 Απρ 2006 (EEST)
- Wireless network - phase 2
Upgrade all access points we use to IOS software- Decide on the best AA scheme and see that is implimented in a minimum configuration
- Radius server running is a must for this phase with NIS capabilities
- Wireless network - phase 3
- See if we can put these access points in a dual VLAN mode so that they work for both the newcampus and zephyros SSID
- Make Radius authenticate via the LDAP server and/or NIS
31-Aug-2006
- VPN
Have a departmental VPN up and running
- Security setup
- Redesign some of the network structure to use the DMZ (put DNS, SMTP and WWW servers there).
- DHCP
Redesign and reconfigure DHCP services (upgrade OS, upgrade DHCP server, failover included)
- LDAP, RADIUS
- Install on permanent location these services (join with DHCP/DNS server???) OTY_Internal:Server Allocation