Line 71: | Line 71: | ||
::* <del>Test - proper network access, XWIN, printing, E-mail etc.</del> Done! --[[User:Ank|ank]] 10:44, 19 Απρ 2006 (EEST) | ::* <del>Test - proper network access, XWIN, printing, E-mail etc.</del> Done! --[[User:Ank|ank]] 10:44, 19 Απρ 2006 (EEST) | ||
* Wireless network - phase 2 | * Wireless network - phase 2 | ||
− | :* Upgrade all access points we use to IOS software | + | :* <del>Upgrade all access points we use to IOS software</del> |
:* Decide on the best AA scheme and see that is implimented in a minimum configuration | :* Decide on the best AA scheme and see that is implimented in a minimum configuration | ||
:: Radius server running is a must for this phase with NIS capabilities | :: Radius server running is a must for this phase with NIS capabilities | ||
Line 81: | Line 81: | ||
'''31-Aug-2006''' | '''31-Aug-2006''' | ||
+ | * VPN | ||
+ | ::* <del>Have a departmental VPN up and running</del> | ||
* Security setup | * Security setup | ||
::* Redesign some of the network structure to use the DMZ (put DNS, SMTP and WWW servers there). | ::* Redesign some of the network structure to use the DMZ (put DNS, SMTP and WWW servers there). |
Revision as of 11:59, 27 July 2006
This page describes (or connects to) one or two current activities for each group.
Labs and Students Support Group
Until January 20:
Install Printer HP2200 to Graduate Lab 201(hp1-201 ?)Done 11/01/2006- Install Opnet Application Capture Agents to 201 lab ??? postponed until next semester
Prepare new programm for epithrhtesClear local profiles from all lab machinesOrder maintenance kit for HP1-B123 and HP1-L0- B123 ReplacedPrepare and place 4 new PCs (Fujitsu Siemens) for B101Done 19/01/2006Set bios passwords for administrator and also user (not to get mac addresses)not possibleCheck all DLP`s in labs.DoneDeny access to domain users to command "getmac"Done 11/01/2006- Stop sychronization by some users to Windows machines (sychronize only when they are logging off - NOT always)
Find a way to change SID to each PC ???time-consuming and not really necessary since machines will be reformatted next semester- Prepare and replace 4 w/s at B103 tm 14:53, 12 Ιαν 2006 (EET)
Replace Norton Anti-virus on CS1993 (room 148)Done 16/01/2006
Until May 31:
Order USB extensions for lab B101 (Fujitsu Siemens PCs)Andrim 15:49, 10 Μαρτ 2006 (EET)- Prepare installation images for lab B103
- Update Computing site
Update Helpdesk siteAndrim 15:49, 10 Μαρτ 2006 (EET)- MSDNAA
- Update print guide to include print quotas
- Investigate the problem with standby mode on IBM machines
Order process (CRM???)DonePrepare and place 4 new PCs (Fujitsu Siemens) for 101.Done 02/02/2006Find a solution to Acrobat Distiller 7.0 CPU usage problem.kekkosFind a solution to jedit (B121-B123) problem.Andrim 15:49, 10 Μαρτ 2006 (EET)Find a solution to SPIN (201)problem.Andrim 15:49, 10 Μαρτ 2006 (EET)Install gcc in order to correct SPIN(201).Andrim 15:49, 10 Μαρτ 2006 (EET)
Until August 31:
- Apply images for lab B103.
- Update all labs softwares.
- Rename printers ibmlab1 and npi8585d5
Core Systems Group
Until January 20:
- Install Print Manager Plus s/w?? or postponed it for next semester
Until May 31:
- TSM
Install 2 HDD (Tuesday Feb. 15)- Reconfiguration of policies
- Include new ultirum drive in set-up
- Finish with TrendMicro server set-up - resolve some problems
- Prepare and finalize Server Storage Plan
- DHCP and DNS server upgrade
Until August 31:
- Prepare a "new Electra" with IIS etc
- Format Electra
Move Kalliopi to new machine- Format Kalliopi and move /research /projects /courses on it
- Set an internal MYSQL server and move all DBs on it
- Prepare a new Astarti (www2n)
- Move most if not all of www2 to www2n
- Format and prepare Astarti
- Review and remove old students,faculty,research a/cs
Networks and Security Group
23-Jan-2006
- Revision of the VLAN schedule, primary aim to assign private IPs to most of our systems especially the Research Labs.
31-May-2006
- Wireless network - phase 1
Properly install and test accees points as they are now without any AA scheme or OS upgrade - good old open wayDone --ank 10:44, 19 Απρ 2006 (EEST)
Test - proper network access, XWIN, printing, E-mail etc.Done! --ank 10:44, 19 Απρ 2006 (EEST)
- Wireless network - phase 2
Upgrade all access points we use to IOS software- Decide on the best AA scheme and see that is implimented in a minimum configuration
- Radius server running is a must for this phase with NIS capabilities
- Wireless network - phase 3
- See if we can put these access points in a dual VLAN mode so that they work for both the newcampus and zephyros SSID
- Make Radius authenticate via the LDAP server and/or NIS
31-Aug-2006
- VPN
Have a departmental VPN up and running
- Security setup
- Redesign some of the network structure to use the DMZ (put DNS, SMTP and WWW servers there).
- DHCP
- Redesign and reconfigure DHCP services (upgrade OS, upgrade DHCP server, failover included)
- LDAP, RADIUS
- Install on permanent location these services (join with DHCP/DNS server???) OTY_Internal:Server Allocation
Hi im a Spambot from 193.243.156.10. Please ban This IP.