Labs and Students Support Group
Until January 20:
Install Printer HP2200 to Graduate Lab 201(hp1-201 ?).Done 11/01/2006- Install Opnet Application Capture Agents to 201 lab ???
- Prepare new programm for epithrhtes.
- Clear local profiles from all lab machines.
- Order maintenance kit for HP1-B123 and HP1-L0.
- Prepare and place new PCs (Fujitsu Siemens) for 201. (How many???)
Set bios passwords for administrator and also user (not to get mac addresses).not possible- Check all DLP`s in labs.
Deny access to domain users to command "getmac".Done 11/01/2006- Stop sychronization by some users to Windows machines (sychronize only when they are logging off - NOT always).
- Find a way to change SID to each PC. ???
- Prepare and replace 4 w/s at B103 tm 14:53, 12 Ιαν 2006 (EET)
Until May 31:
- Prepare installation images for lab B101
Until August 31:
Core Systems Group
Until January 20:
- Install Print Manager Plus s/w?? or postponed it for next semester
Until May 31:
- TSM
- Install 2 HDD
- Reconfiguration of policies
- Include new ultirum drive in set-up
- Prepare a "new Electra" with IIS etc
- Format Electra
- Set an internal MYSQL server and move all DBs on it
- Prepare a new Astarti (www2n)
- Move most if not all of www2 to www2n
- Format and prepare Astarti
- Review and remove old students,faculty,research a/cs
- Finish with TrendMicro server set-up - resolve some problems
- Prepare and finalize Server Storage Plan
- DHCP and DNS server upgrade
Networks and Security Group
23-Jan-2005
- Revision of the VLAN schedule, primary aim to assign private IPs to most of our systems especially the Research Labs.
31-May-2005
31-Aug-2005